1992 |
TFTC was established at Rende. |
1994 |
February TFTC moved to Hsin Taen Road, Jen Teh Hsiang. |
1996 |
first filling & packaging line in China Beijing (600CPM) |
1997 |
first (SUNTORY) tea drink filling & packaging line (300BPM, PET bottle) in Shanghai. |
1998 |
TFTC moved to Kuei Jen Hsiang, also enlarged production and started after-sale service department in June |
1999 |
develop first Auto. CIP type Gravity Filler for fresh milk product which was the base for fresh product filler. |
2000 |
first Piston Positioning Type Filler suitable for filling “High Viscosity Liquid “ developed, such as drinking yogurt. |
2001 |
TFTC certificated of ISO 9001 SGS in April. |
2001 |
first Injection Filler developed for PP bottle. |
2002 |
develop first Injection Filler for poly bag. |
2003 |
TFTC provided Thailand OISHI Group first tea drink processing, filling & packaging line equipments (300BPM), formally enter Thailand market. |
2003 |
TFTC got ISO 9001 2000 certificate. |
2004 |
Egypt's first cooking oil filling & packaging line (200BPM), and officially into African market. |
2005 |
Whole line equipments (350BPM) for Thailand Boonrawd Bewery tea drink. |
2006 |
Friesland Indonesia placed an long-kept milk fillinbg line. (100ml, 500BPM) |
2006 |
Calpis Japan placed an order of packaging line in Indonesia. (100ml, 400BPM) |
2006 |
Golden Car company placed an order of whole line.(coffee, 300ml, 600BPM) |
2007 |
New plant completion of TFTC, with 11500 square meters. |
2008 |
1st hot filling machine with Food GMP certificated, 300BPM, co-working with Taiwan Food Industry Research and Development Institute.
|
2008 |
Joined Propak Asia 2008 exhibition, Bangkok, Thailand. |
2009 |
1st aseptic filler for small volume developed, co-working together with Taiwan Food Industry Research and Development Institute. |
2009 |
TFTC certificated with ISO 9001 2008 version. |
2010 |
Ichitan(Thailand) placed an order of aseptic line. (600BPM, 420ml) |
2010 |
Developing of soft drink filling in regular temperature (10~18 degrees) |
2011 |
Ichitan(Thailand) placed another 2 aseptic lines. (600BPM, 420ml) |
2011 |
Weichuan's branch in Hanchou placed an order of yogurt production line. (400BPM) |
2011 |
Mengniu ordered 2 production lines for yogurt. |
2011 |
Uni-president in Xinshi placed an order of fresh milk packaging line. (4.5L) |
2012 |
Ichitan(Thailand) placed 4th aseptic line. (600BPM, 420ml) |
2012 |
Weichuan's branch in Hanchou placed an order of coffee milk packaging line. (300BPM, 250ml) |
2012 |
TOYOPACK(JAPAN) placed 2 aseptic packaging line (400BPM) in China. |
2012 |
TOYOPACK(JACK) placd an aseptic packaginf libner |
2014 |
JUNLEBAO placed an order of 2 production lines. (350BPM, 265ml) and 170BPM (900ml). |